1 |
0 |
Design Report |
Piece 1-Dam Presentation |
March 2015 - Updated on June 2015 - Revised on February 2016 |
124 |
2 |
1 |
Seismic / Safety Reports |
Note on Earthquake Safety for Bisri Dam, Erdik & DRB |
May 2019 |
12 |
3 |
2 |
Earthquake Hazard Study, Erdik |
October 2014 |
44 |
4 |
3 |
BISRI neo-tectonic, A. Elias |
August 2014 |
20 |
5 |
4 |
Piece 4-Calculs dynamiques |
February 2015 |
221 |
6 |
5 |
Piece 3-3-Note de calcul de stabilité -Pseudo-Statique |
February 2015 |
44 |
7 |
6 |
Geology and Geotechnical Reports |
Piece 2- Rapport Géologique De Synthèse |
November 2014 - Revised on December 2014 |
97 |
|
7 |
Geotechnical Investigation Reports [12 Volumes] |
8 |
7.1 |
Geo.Tech. Invst. Rep I (Factual) |
January 2014 |
152 |
9 |
7.2 |
Geo.Tech. Invst. Rep II, Dam Footprint |
February 2014 |
199 |
10 |
7.3 |
Geo.Tech. Invst. Rep III |
March 2014 |
174 |
11 |
7.4 |
Geo.Tech. Invst. Rep IV |
May 2014 |
258 |
12 |
7.5 |
Geo.Tech. Invst. Rep. V |
June 2014 |
202 |
13 |
7.6 |
Geo.Tech. Invst. Rep. VI |
July 2014 |
191 |
14 |
7.7 |
Geo.Tech. Invst. Rep. VII |
September 2014 |
124 |
15 |
7.8 |
Geo.Tech.Invst. Rep.VIII. |
September 2014 |
257 |
16 |
7.9 |
Geo.Tech. Invst. Rep. IX |
November 2014 |
119 |
17 |
7.10 |
Geo.Tech.Invst.Rep X |
November 2014 |
186 |
18 |
7.11 |
Geo.Tech. Invst. Rep. XI |
November 2014 |
119 |
19 |
7.12 |
Geo. Tech.Invst.Rep. XII |
November 2014 |
208 |
|
8 |
CPTu Geotechnical Tests- Factual Report [4 Volumes] |
20 |
8.1 |
CPTu Geotechnical Tests- Factual Report Vol 1/4 |
January 2016 |
772 |
21 |
8.2 |
CPTu Geotechnical Tests- Factual Report Vol 2/4 |
January 2016 |
689 |
22 |
8.3 |
CPTu Geotechnical Tests- Factual Report Vol 3/4 |
January 2016 |
734 |
23 |
8.4 |
CPTu Geotechnical Tests- Factual Report Vol 4/4 |
January 2016 |
790 |
24 |
9 |
Piece 3-1- Geotechnical Note |
February 2015 - Updated February 2016 |
19 |
25 |
10 |
Piece 3-2-Evaluation of the Settlement |
February 2015 - Updated February 2016 |
70 |
26 |
11 |
Piece 3-4-Bisri Dam Technical Note |
March 2016 |
17 |
27 |
12 |
Hydrology and Hydraulics Reports |
Piece 5-Updated Hydrology Report |
May 2013 - Updated on March 2014 |
139 |
28 |
13 |
Piece 6-Dam Breach Model |
November 2014 |
109 |
29 |
14 |
Piece 7.1- Rapport de hydrauliques |
May 2013 - Revised on April 2014 |
33 |
30 |
15 |
Piece 7.2- Modele Hydraulique |
April 2014 |
74 |
31 |
16.1 |
Safeguard Reports |
ESIA - Volume 1 |
August 2014 |
352 |
32 |
16.2 |
ESIA - Volume 2 |
August 2014 |
492 |
33 |
17.1 |
RAP - English |
May 2014 |
259 |
34 |
17.2 |
RAP- Arabic |
May 2014 |
320 |
35 |
18 |
Feasibility Report |
Updated Feasibility Report |
January 2011 |
327 |
36 |
19 |
Inspection Panel Report |
Inspection Panel Report and Recommendation |
November 2018 |
148 |